diff options
author | Dave Cobbley <david.j.cobbley@linux.intel.com> | 2018-08-14 20:05:37 +0300 |
---|---|---|
committer | Brad Bishop <bradleyb@fuzziesquirrel.com> | 2018-08-23 04:26:31 +0300 |
commit | eb8dc40360f0cfef56fb6947cc817a547d6d9bc6 (patch) | |
tree | de291a73dc37168da6370e2cf16c347d1eba9df8 /meta-openembedded/meta-multimedia/recipes-mediacenter/kodi/kodi-17/0001-change-order-of-detecting-libegl-and-libgles2.patch | |
parent | 9c3cf826d853102535ead04cebc2d6023eff3032 (diff) | |
download | openbmc-eb8dc40360f0cfef56fb6947cc817a547d6d9bc6.tar.xz |
[Subtree] Removing import-layers directory
As part of the move to subtrees, need to bring all the import layers
content to the top level.
Change-Id: I4a163d10898cbc6e11c27f776f60e1a470049d8f
Signed-off-by: Dave Cobbley <david.j.cobbley@linux.intel.com>
Signed-off-by: Brad Bishop <bradleyb@fuzziesquirrel.com>
Diffstat (limited to 'meta-openembedded/meta-multimedia/recipes-mediacenter/kodi/kodi-17/0001-change-order-of-detecting-libegl-and-libgles2.patch')
-rw-r--r-- | meta-openembedded/meta-multimedia/recipes-mediacenter/kodi/kodi-17/0001-change-order-of-detecting-libegl-and-libgles2.patch | 32 |
1 files changed, 32 insertions, 0 deletions
diff --git a/meta-openembedded/meta-multimedia/recipes-mediacenter/kodi/kodi-17/0001-change-order-of-detecting-libegl-and-libgles2.patch b/meta-openembedded/meta-multimedia/recipes-mediacenter/kodi/kodi-17/0001-change-order-of-detecting-libegl-and-libgles2.patch new file mode 100644 index 000000000..12a6c06e8 --- /dev/null +++ b/meta-openembedded/meta-multimedia/recipes-mediacenter/kodi/kodi-17/0001-change-order-of-detecting-libegl-and-libgles2.patch @@ -0,0 +1,32 @@ +From 21524598110e7a55113205dda4bc1a6d5987111c Mon Sep 17 00:00:00 2001 +From: Khem Raj <raj.khem@gmail.com> +Date: Tue, 9 May 2017 06:41:33 +0000 +Subject: [PATCH] change order of detecting libegl and libgles2 + +This actually helps building it on rpi/userland +where libEGL depends on few functions from libGLESv2 +see +https://www.raspberrypi.org/forums/viewtopic.php?t=7090 + +Signed-off-by: Khem Raj <raj.khem@gmail.com> +--- + configure.ac | 2 +- + 1 file changed, 1 insertion(+), 1 deletion(-) + +diff --git a/configure.ac b/configure.ac +index b9e4240..1ca0297 100644 +--- a/configure.ac ++++ b/configure.ac +@@ -951,8 +951,8 @@ if test "$use_gles" = "yes"; then + AC_MSG_RESULT(== WARNING: OpenGLES support is assumed.) + LIBS="$LIBS -lEGL -lGLESv2 -lbcm_host -lvcos -lvchiq_arm -lmmal -lmmal_core -lmmal_util -lvcsm" + else +- AC_CHECK_LIB([EGL], [main],, AC_MSG_ERROR($missing_library)) + AC_CHECK_LIB([GLESv2],[main],, AC_MSG_ERROR($missing_library)) ++ AC_CHECK_LIB([EGL], [main],, AC_MSG_ERROR($missing_library)) + fi + fi + else +-- +1.9.1 + |