summaryrefslogtreecommitdiff
path: root/meta-openembedded/meta-multimedia/recipes-mediacenter/kodi/kodi-17/0001-change-order-of-detecting-libegl-and-libgles2.patch
diff options
context:
space:
mode:
Diffstat (limited to 'meta-openembedded/meta-multimedia/recipes-mediacenter/kodi/kodi-17/0001-change-order-of-detecting-libegl-and-libgles2.patch')
-rw-r--r--meta-openembedded/meta-multimedia/recipes-mediacenter/kodi/kodi-17/0001-change-order-of-detecting-libegl-and-libgles2.patch32
1 files changed, 0 insertions, 32 deletions
diff --git a/meta-openembedded/meta-multimedia/recipes-mediacenter/kodi/kodi-17/0001-change-order-of-detecting-libegl-and-libgles2.patch b/meta-openembedded/meta-multimedia/recipes-mediacenter/kodi/kodi-17/0001-change-order-of-detecting-libegl-and-libgles2.patch
deleted file mode 100644
index 12a6c06e8..000000000
--- a/meta-openembedded/meta-multimedia/recipes-mediacenter/kodi/kodi-17/0001-change-order-of-detecting-libegl-and-libgles2.patch
+++ /dev/null
@@ -1,32 +0,0 @@
-From 21524598110e7a55113205dda4bc1a6d5987111c Mon Sep 17 00:00:00 2001
-From: Khem Raj <raj.khem@gmail.com>
-Date: Tue, 9 May 2017 06:41:33 +0000
-Subject: [PATCH] change order of detecting libegl and libgles2
-
-This actually helps building it on rpi/userland
-where libEGL depends on few functions from libGLESv2
-see
-https://www.raspberrypi.org/forums/viewtopic.php?t=7090
-
-Signed-off-by: Khem Raj <raj.khem@gmail.com>
----
- configure.ac | 2 +-
- 1 file changed, 1 insertion(+), 1 deletion(-)
-
-diff --git a/configure.ac b/configure.ac
-index b9e4240..1ca0297 100644
---- a/configure.ac
-+++ b/configure.ac
-@@ -951,8 +951,8 @@ if test "$use_gles" = "yes"; then
- AC_MSG_RESULT(== WARNING: OpenGLES support is assumed.)
- LIBS="$LIBS -lEGL -lGLESv2 -lbcm_host -lvcos -lvchiq_arm -lmmal -lmmal_core -lmmal_util -lvcsm"
- else
-- AC_CHECK_LIB([EGL], [main],, AC_MSG_ERROR($missing_library))
- AC_CHECK_LIB([GLESv2],[main],, AC_MSG_ERROR($missing_library))
-+ AC_CHECK_LIB([EGL], [main],, AC_MSG_ERROR($missing_library))
- fi
- fi
- else
---
-1.9.1
-