summaryrefslogtreecommitdiff
path: root/kernel/sched/core.c
diff options
context:
space:
mode:
authorVincent Guittot <vincent.guittot@linaro.org>2023-11-22 16:39:03 +0300
committerIngo Molnar <mingo@kernel.org>2023-11-23 13:32:01 +0300
commit9c0b4bb7f6303c9c4e2e34984c46f5a86478f84d (patch)
tree8d696fcb82ac285650e004f667b9ba73096149fc /kernel/sched/core.c
parent50181c0cff31281b9f1071575ffba8a102375ece (diff)
downloadlinux-9c0b4bb7f6303c9c4e2e34984c46f5a86478f84d.tar.xz
sched/cpufreq: Rework schedutil governor performance estimation
The current method to take into account uclamp hints when estimating the target frequency can end in a situation where the selected target frequency is finally higher than uclamp hints, whereas there are no real needs. Such cases mainly happen because we are currently mixing the traditional scheduler utilization signal with the uclamp performance hints. By adding these 2 metrics, we loose an important information when it comes to select the target frequency, and we have to make some assumptions which can't fit all cases. Rework the interface between the scheduler and schedutil governor in order to propagate all information down to the cpufreq governor. effective_cpu_util() interface changes and now returns the actual utilization of the CPU with 2 optional inputs: - The minimum performance for this CPU; typically the capacity to handle the deadline task and the interrupt pressure. But also uclamp_min request when available. - The maximum targeting performance for this CPU which reflects the maximum level that we would like to not exceed. By default it will be the CPU capacity but can be reduced because of some performance hints set with uclamp. The value can be lower than actual utilization and/or min performance level. A new sugov_effective_cpu_perf() interface is also available to compute the final performance level that is targeted for the CPU, after applying some cpufreq headroom and taking into account all inputs. With these 2 functions, schedutil is now able to decide when it must go above uclamp hints. It now also has a generic way to get the min performance level. The dependency between energy model and cpufreq governor and its headroom policy doesn't exist anymore. eenv_pd_max_util() asks schedutil for the targeted performance after applying the impact of the waking task. [ mingo: Refined the changelog & C comments. ] Signed-off-by: Vincent Guittot <vincent.guittot@linaro.org> Signed-off-by: Ingo Molnar <mingo@kernel.org> Acked-by: Rafael J. Wysocki <rafael@kernel.org> Link: https://lore.kernel.org/r/20231122133904.446032-2-vincent.guittot@linaro.org
Diffstat (limited to 'kernel/sched/core.c')
-rw-r--r--kernel/sched/core.c90
1 files changed, 38 insertions, 52 deletions
diff --git a/kernel/sched/core.c b/kernel/sched/core.c
index 2de77a6d5ef8..db4be4921e7f 100644
--- a/kernel/sched/core.c
+++ b/kernel/sched/core.c
@@ -7467,18 +7467,13 @@ int sched_core_idle_cpu(int cpu)
* required to meet deadlines.
*/
unsigned long effective_cpu_util(int cpu, unsigned long util_cfs,
- enum cpu_util_type type,
- struct task_struct *p)
+ unsigned long *min,
+ unsigned long *max)
{
- unsigned long dl_util, util, irq, max;
+ unsigned long util, irq, scale;
struct rq *rq = cpu_rq(cpu);
- max = arch_scale_cpu_capacity(cpu);
-
- if (!uclamp_is_used() &&
- type == FREQUENCY_UTIL && rt_rq_is_runnable(&rq->rt)) {
- return max;
- }
+ scale = arch_scale_cpu_capacity(cpu);
/*
* Early check to see if IRQ/steal time saturates the CPU, can be
@@ -7486,45 +7481,49 @@ unsigned long effective_cpu_util(int cpu, unsigned long util_cfs,
* update_irq_load_avg().
*/
irq = cpu_util_irq(rq);
- if (unlikely(irq >= max))
- return max;
+ if (unlikely(irq >= scale)) {
+ if (min)
+ *min = scale;
+ if (max)
+ *max = scale;
+ return scale;
+ }
+
+ if (min) {
+ /*
+ * The minimum utilization returns the highest level between:
+ * - the computed DL bandwidth needed with the IRQ pressure which
+ * steals time to the deadline task.
+ * - The minimum performance requirement for CFS and/or RT.
+ */
+ *min = max(irq + cpu_bw_dl(rq), uclamp_rq_get(rq, UCLAMP_MIN));
+
+ /*
+ * When an RT task is runnable and uclamp is not used, we must
+ * ensure that the task will run at maximum compute capacity.
+ */
+ if (!uclamp_is_used() && rt_rq_is_runnable(&rq->rt))
+ *min = max(*min, scale);
+ }
/*
* Because the time spend on RT/DL tasks is visible as 'lost' time to
* CFS tasks and we use the same metric to track the effective
* utilization (PELT windows are synchronized) we can directly add them
* to obtain the CPU's actual utilization.
- *
- * CFS and RT utilization can be boosted or capped, depending on
- * utilization clamp constraints requested by currently RUNNABLE
- * tasks.
- * When there are no CFS RUNNABLE tasks, clamps are released and
- * frequency will be gracefully reduced with the utilization decay.
*/
util = util_cfs + cpu_util_rt(rq);
- if (type == FREQUENCY_UTIL)
- util = uclamp_rq_util_with(rq, util, p);
-
- dl_util = cpu_util_dl(rq);
+ util += cpu_util_dl(rq);
/*
- * For frequency selection we do not make cpu_util_dl() a permanent part
- * of this sum because we want to use cpu_bw_dl() later on, but we need
- * to check if the CFS+RT+DL sum is saturated (ie. no idle time) such
- * that we select f_max when there is no idle time.
- *
- * NOTE: numerical errors or stop class might cause us to not quite hit
- * saturation when we should -- something for later.
+ * The maximum hint is a soft bandwidth requirement, which can be lower
+ * than the actual utilization because of uclamp_max requirements.
*/
- if (util + dl_util >= max)
- return max;
+ if (max)
+ *max = min(scale, uclamp_rq_get(rq, UCLAMP_MAX));
- /*
- * OTOH, for energy computation we need the estimated running time, so
- * include util_dl and ignore dl_bw.
- */
- if (type == ENERGY_UTIL)
- util += dl_util;
+ if (util >= scale)
+ return scale;
/*
* There is still idle time; further improve the number by using the
@@ -7535,28 +7534,15 @@ unsigned long effective_cpu_util(int cpu, unsigned long util_cfs,
* U' = irq + --------- * U
* max
*/
- util = scale_irq_capacity(util, irq, max);
+ util = scale_irq_capacity(util, irq, scale);
util += irq;
- /*
- * Bandwidth required by DEADLINE must always be granted while, for
- * FAIR and RT, we use blocked utilization of IDLE CPUs as a mechanism
- * to gracefully reduce the frequency when no tasks show up for longer
- * periods of time.
- *
- * Ideally we would like to set bw_dl as min/guaranteed freq and util +
- * bw_dl as requested freq. However, cpufreq is not yet ready for such
- * an interface. So, we only do the latter for now.
- */
- if (type == FREQUENCY_UTIL)
- util += cpu_bw_dl(rq);
-
- return min(max, util);
+ return min(scale, util);
}
unsigned long sched_cpu_util(int cpu)
{
- return effective_cpu_util(cpu, cpu_util_cfs(cpu), ENERGY_UTIL, NULL);
+ return effective_cpu_util(cpu, cpu_util_cfs(cpu), NULL, NULL);
}
#endif /* CONFIG_SMP */